Consider a computer running a program that requires 240 seconds, with 80 seconds spent executing FP instructions, 80 seconds spent executing INT instructions, 45 seconds spent executing branch instructions, and 35 seconds executing load/store instructions. If INT are reduced by 20%, what is the new time spent on INT instructions? Also list the percent reduction in time executing INT instructions.

Consider a computer running a program that requires 240 seconds, with 80 seconds spent executing FP instructions, 80 seconds spent executing INT instructions, 45 seconds spent executing branch instructions, and 35 seconds executing load/store instructions. If INT are reduced by 20%, what is the new time spent on INT instructions? Also list the percent reduction in time executing INT instructions.




Answer: 